| Date: | 12/03/2007 |
| Location: | East side of Campus |
| Notes: | Construction will begin Monday, Dec. 3, on a 2,000-seat expansion to the east side of Washington-Grizzly Stadium at The University of Montana. Drivers are asked to slow down and expect possible delays on Campus Drive. Then on Dec. 15, a section of Campus Drive east of the stadium will be closed to through traffic until the building project is completed in August 2008. http://news.umt.edu/index.asp?sec=1&too=100&eve=1000&id=1923 |
| Date: | 06/18/2008 |
| Location: | Missoula MT |
| Notes: | Disability Services for Students offers a Transition Seminar designed for high school juniors, seniors, and others with disabilities who are soon to be college freshmen. The three day seminar facilitates the transition for students with disabilities from secondary to post-secondary education, into any institution of higher learning. The seminar offers opportunities for the students to develop self-determination skills. It is all about learning the options and making choices! |